Sandbanks West 2016

Alterations to 6 existing single storey brick and block beach huts to include 6 new beach huts above with projecting balconies and access stairs.

Principal Designer Davison Mondon Associates
Principal Contractor Westmade Building Contractors

Sandbanks West 2015

Three new beach huts.

Principal Contractor MDH Groundworks

Flaghead Chine 2015

Alterations to 10 existing single storey brick and block beach huts to include 10 new beach huts above with projecting balconies and access stairs.

Principal Designer Davison Mondon Associates
Principal Contractor Morgan Sindall

Branksome Chine West 2015

Alterations to existing brick shelter to form a total of 16 beach huts on two levels, plus a new wheelchair accessible ramp and WC, external refurbishment of existing male and female toilets.

Principal Designer Davison Mondon Associates
Principal Contractor Morgan Sindall

Branksome Chine East 2015

Remove 28 existing beach huts and construct a total of 62 new beach huts on two levels, in 3 blocks, and install an access ramp from the lower promenade.

Principal Designer Davison Mondon Associates
Principal Contractor Morgan Sindall

Branksome Dene 2015

External refurbishment of 96 beach huts.

Brought to you by

Culture & Community Services

Sustaining Poole's Seafront

Developed in consultation with residents and visitors the Sustaining Poole’s Seafront Supplementary Planning Document was adopted by Council in December 2015. The document sets out a vision for how the Council plans to conserve, improve and invest in our Seafront over the next 25 years.

Our Beaches

Everything you need to know about each of Poole's beaches, accessibility and facilities.

Visit poole.gov.uk

Poole Beaches online

For regular beach news & updates

Share This